Training


Master ESD Control & Compliance
Free Virtual Training offered 4 different times throughout
the year by Desco Industries Inc.
 
Desco Industries ANSI/ESD S20.20-2021 Training – 4 Day Course
Registration ends Tuesday, October 20th!
 

ANSI/ESD S20.20-2021 is the Standard used by companies all over the world for guidance in implementing, verifying, and maintaining high quality ESD Control Programs. Desco Industries is offering a training course that is targeted for ESD professionals who would like to gain an understanding of the basic purpose and details of the ANSI/ESD S20.20-2021 standard. This course will be particularly helpful to those who are new to the implementation and management of an ESD Program of any size or any scope, no matter how deep your involvement is in the ESD Program

 
Tuesday, October 27, 2026 – 1:00 PM – 3:00 PM EST
ESD Basics/Technical and Administrative Review of S20.20-2021
 
Tuesday, November 3, 2026 – 1:00 PM – 3:00 PM EST
Grounding/Personnel Grounding-Wrist Straps/Continuous Monitoring/Flooring-Personnel Grounding
 
Tuesday, November 10, 2026 – 1:00 PM – 3:00 PM EST
Worksurfaces/Mobile Equipment/Shelving/Seating
 
Tuesday, November 17, 2026 – 1:00 PM – 3:00 PM EST
Packaging/Ionization//Garments/Gloves/Finger Cots

Desco Industries TR53 Training – 2 Day Course

Registration ended Wednesday, October 7th.  Stay tuned for the next class.  To Be Announced.

The Working Pro’s Guide to TR53® Compliance (Registered Trademark of EOS/ESD Association Inc. )

ESD TR20.20-2016

5.4 Compliance Verification Plan

A compliance verification plan shall be established to ensure the organization’s fulfillment of the requirements of the plan. Process monitoring (measurements) shall be conducted in accordance with a compliance verification plan that identifies the technical requirements to be verified, the measurement limits and the frequency at which those verifications shall occur. The compliance verification plan shall document the test methods used for process monitoring and measurements. If the organization uses different test methods to replace those of this standard, the organization shall be able to show that the results achieved correlate with the referenced standards. Where test methods are devised for testing items not covered in this standard, these shall be adequately documented including corresponding test limits. Compliance verification records shall be established and maintained to provide evidence of conformity to the technical requirements.

What is a Compliance Verification Plan?

• Identifies technical requirements/ESD control items to be verified

• Measurement limits per ANSI/ESD S20.20-2021

• Frequency of verification

• Test methods and equipment used

• Tailoring statements as necessary

• Maintain records of verifications

 

October 13th from 10:00 AM – 11:30 AM PST

October 14th from 10:00 AM – 11:30 AM PST

 

 

Contact Us Today

[email protected]
(908) 279-7266

Wilson Industries, Inc. | 58 Years of Excellence

Wilson Industries Inc. | Since 1968

Since 1968, now through three generations, Wilson Industries Inc. supports
leading-edge manufactures with unmatched sales expertise.

We represent top manufacturers across multiple industries that develop innovative solutions to meet the needs of our customers.